Tender
23-04-2014
The plans for the replacement of a traditional STP with Verdygo in Simpelveld (Limburg, The Netherlands) are completely finished and ready for tendering. Through a European tendering project the main contractor will be appointed based on the ‘Best Value’ method.
The replacement of the middle part of the installation in Simpelveld uses the NEREDA® principle. The new tanks will be built following the Verdygo principle (flexible, adjustable and transportable). In consultation with the market different materials will be applied and innovatively combined, this can be materials such as: concrete, steel or possibly wood and composite material.